Following type and number of wells for each area as listed as under shall be part of Project scope of work:
Project No.: P30334
Document No: 30-99-93-1601
Mainly Scope consists of new wells and conversion wells as listed below:
1) Conversion of Oil producing wells to Gas lift Oil producing wells
2) Conversion of Oil producing wells to ESP Oil producing wells
3) Conversion of Water Injection wells to Water Alternating Gas wells
4) Conversion of Water Injection wells to Produced Water Re-injection well
5) ESP Oil Producing Wells for undeveloped reservoirs
6) Gas lift Oil Producer Wells
7) Water Alternating Gas wells
8) Water Injection Wells
9) Produced Water Disposal Wells
10) Simplified Water injection Clusters
The Scope shall include detailed engineering and design that is required for defining the procurement and construction including fabrication, installation, testing, pre-commissioning, and commissioning for the above-mentioned wells.